Technical Session 08: Well Plug and Abandonment (P&A) and Decommissioning
Thursday, 6 August
Bougainville Room, Level 1
Technical Session
Session Chairpersons
-
1120-1140 233132The Art of Knowing What Not to Fix: Converting Multi-block Subsurface Complexity into a Defensible, ALARP-driven Abandonment Strategy
-
1140-1200 233064Enhancing p&A Integrity Through Thru-tubing Logging Technologies: Comprehensive Evaluation Of Cement Bond, Flow Channeling, And Casing Corrosion With Thru Tubing Cement Evaluation - TTCE, Noise Log, And Magnetic Thickness Detector - MTD Tools
-
1200-1220 233143From Novice To Proficiency: Development Of A Robust Methodology For Locating Legacy Stumps And Preparing Slots For Infill Wells
-
Alternate 233042Pushing Boundaries in Rigless P&A: Through Tubing Cementing on Wire using a Large Capacity Bailer in a High Risk Legacy Gas Well
-
Alternate 233086Optimising Plug and Abandonment Operations: Consistently Outperforming Time and Cost Benchmarks Across 86 Offshore Wells in Brunei Shell Petroleum
-
Alternate 233094Applying Specialised AI Agents for Plug and Abandonment Operation Analysis and Regulatory Compliance: A Fundamental Shift Towards Automating Workflows and Augmenting Engineer’s Capabilities
-
Alternate 233092Redefining Well Abandonment Excellence: Innovative Approaches To Achieve Lean And Cost-effective Plug And Abandonment At Beta Platform
SPE/IADC Asia Pacific Drilling Technology Conference and Exhibition










