Technical Session 08: Well Plug and Abandonment (P&A) and Decommissioning
Thursday, 6 August
Bougainville Room, Level 1
Technical Session
Session Chairpersons
-
1100-1120 233139Annular Remediation Learnings And Optimisation Opportunities Part II: The Use Of Hydromechanical Perforation And Expanding Polymer Grain Technology In Remediating Annular Cement In The Presence Of Gas
-
1120-1140 233132The Art Of Knowing What Not To Fix: Converting Multi-block Subsurface Complexity Into A Defensible, ALARP-driven Abandonment Strategy
-
1140-1200 233064Enhancing p&A Integrity Through Thru-tubing Logging Technologies: Comprehensive Evaluation Of Cement Bond, Flow Channeling, And Casing Corrosion With Thru Tubing Cement Evaluation - TTCE, Noise Log, And Magnetic Thickness Detector - MTD Tools
-
1200-1220 233143From Novice To Proficiency: Development Of A Robust Methodology For Locating Legacy Stumps And Preparing Slots For Infill Wells
-
Alternate 233042Pushing Boundaries In Rigless p&A: Through Tubing Cementing On Wire Using A Large Capacity Bailer In A High Risk Legacy Gas Well
-
Alternate 233086Optimize Plug And Abandonment Operations - Consistently Outperforming Time And Cost Benchmarks Across 86 Wells In Brunei Shell Petroleum
-
Alternate 233094Applying Specialized Ai Agents For Plug And Abandonment Operation Analysis And Regulatory Compliance: A Fundamental Shift Towards Automating Workflows And Augmenting Engineer's Capabilities.
-
Alternate 233092Redefining Well Abandonment Excellence: Innovative Approaches To Achieve Lean And Cost-effective Plug And Abandonment At Beta Platform
SPE/IADC Asia Pacific Drilling Technology Conference and Exhibition
