Technical Session 04: Casing While Drilling: Performance Breakthroughs Across Challenging Environments
Wednesday, 5 August
Bougainville Room, Level 1
Technical Session
-
1550-1610 233049Casing While Drilling (cwd) In Mature Fields: Lessons Learned, Innovation And The Digital Transformation After 600 Wells In The San Jorge Gulf Basin
-
1610-1630 233138Managing Dual Hazards Of Shallow Gas And Severe Loss Circulation With Drilling With Casing: Post-blowout Recovery Success Delivering Usd 750k Savings In The Pamaguan Field
-
1630-1650 233119World's First Unified 30" And 20" Casing While Drilling: A Game Changer In Improving Well Delivery Time
-
Alternate 233084From Complex To Seamless Revolutionizing Splitter Well Separation With Sacrificial Casing: 1st In The World A Case Study In Offshore Mahakam
-
Alternate 233105Enhancing Casing Running Efficiency In Pertamina Ep Zone 9 Through Supersub Implementation
-
Alternate 233135Implementation Of 20-inch Casing While Drilling (CWD) Successfully Improved Operational Performance In Offshore East-java Well Operation
-
Alternate 233125Reducing Fluid Consumption And Improving Efficiency Using Drilling With Casing: A Comparative Study From Phss Mature Fields -usd 1 Million In Cost Savings
-
Alternate 233037Casing While Drilling (CWD) Successfully Deployed In Unconventional Openhole Sidetracked Well In 18.625-inch X 22-inch Shallow Loose Sand Formation
SPE/IADC Asia Pacific Drilling Technology Conference and Exhibition
