Skip to main content
Loading

Plunger Lift and Hybrid Systems

Tuesday, 25 August
Waterway 4
Technical Session
Session Chairpersons
Jordan Portillo - Occidental E&P Co.
Lina Matiz
  • 1600-1630 233017
    Dissolvable Packers: Enabling Day-one Gas Lift And Setting A New Well Control Standard In High-pressure Wells
    E. Sappington, J. Koessler, Devon Energy Corporation; J. Daniels, B. Kennedy, Shale Oil Tools
  • 1630-1700 232980
    A Physics-based Design Framework For Plunger Lift Upstroke
    A. Akhiiartdinov, Cognite; E. Pereyra, C. Sarica, University of Tulsa
  • 1700-1730 233013
    Plunger-assisted Gas Lift In 3-1/2" Tubing: Diagnosis, Operational Range, And Comparison With Tubing Replacement
    O. Sayman, Plunger Dynamics LLC; T. Trentadue, D. Laird, A. Fernandez, Coterra Energy Inc; S. Suarez, Z. King, Flowco Production Solutions
  • Alternate 232997
    Interlocking Downhole-spring Architecture For Plunger-lift Systems: Improving Reliability, Reducing Full-assembly Replacements, And Minimizing Non-productive Time
    C. Garrett, Liberty Lift
  • Alternate 232984
    Steady-state Design Procedure For Air-lift Pumps With Integrated Flow Assurance Analysis
    H. Nguyen, E. Pereyra, University of Tulsa; G. Sommese, Air Lift Technology LLC; R. Knappe, Warrior Exploration & Production, LLC