Moving the Line: Field-Proven Strategies to Extend ESP Runlife
Thursday, 27 August
Waterway 4
Technical Session
Session Chairpersons
-
Alternate 233020Extending ESP Runtimes On Refrac Wells And 4 Miles Lateral
-
Alternate 232987Innovative Technology For Gas Handling And Solids Control To Extend Esp Run Life A Villano Field Case Study
-
Alternate 232972Enhancing Esp Performance Through Integrated Hydraulic And Electrical Analytics: Pilot Results From A Multi-well Deployment
-
Alternate 232999Canned Motor Pump Technology For Subsea Mudline Boosting Applications
-
Alternate 233012Optimizing Unconventional Well Production: Integrated Operational Strategy Using Enhanced Compression Pumps Operating In Motor Amps Feedback Mode At The Lowest Bottomhole Pressures
-
Alternate 233018Implementation And Field Validation Of Real-time Insulation Monitoring And Downhole Measurements System For Esp Installations

