Moving the Line: Field-Proven Strategies to Extend ESP Runlife
Thursday, 27 August
Waterway 4
Technical Session
Session Chairpersons
-
1530-1600 233020Extending ESP Runtimes on Refractured Wells and 4-Mile Laterals
-
1600-1630 232987Innovative Technology for Gas Handling and Solids Control to Extend ESP Run Life: A Villano Field Case Study
-
1630-1700 232972Enhancing ESP Performance through Integrated Hydraulic and Electrical Analytics: Lessons Learned from Multi-Well Deployment
-
Alternate 232999Canned Motor Pump Technology For Subsea Mudline Boosting Applications
-
Alternate 233012Optimizing Unconventional Well Production: Integrated Operational Strategy Using Enhanced ESP Operating In Motor Amps Feedback Mode At The Lowest Bottomhole Pressures
-
Alternate 233018Implementation And Field Validation Of Real-time Insulation Monitoring And Downhole Measurements System For Esp Installations
