Skip to main content
Loading

Engineering Ingenuity to Optimize Unconventional Well Performance

Wednesday, 26 August
Waterway 4
Technical Session
Session Chairpersons
Bruce Gerrard - Apache Corp.
Danny Perez
  • 1400-1430 232971
    DJ Basin GALLOP Pilot Review: Unloading From The Lateral With A Novel Gas Lift Variant To Extend Well Life
    R. Hieronymus, Occidental Petroleum Corp.; D. Green, Well Master Corp.; S. Wilson, Ryder Scott Company, L.P.
  • 1430-1500 232975
    Experimental Investigation Of Sand Transport In Upward Gas-liquid Flow: Implications For Toe-down Wells And Artificial Lift Performance
    S.T. Do, C. Nogueira Sondermann, E. Pereyra, C. Sarica, University of Tulsa
  • 1500-1530 233000
    Design And Optimization Of High-volume Jet-pump Installations In Unconventional And Conventional Wells
    L. Vasicek, DG Petro Oil and Gas
  • Alternate 233009
    A New Adaptive And Flexible Solution For Oil Production: A Rodless Linear Electric Submersible Pump Designed For Challenging Well Conditions.
    H. Shcherba, T. Pacha, Triol Corporation
  • Alternate 232995
    Mapping Artificial Lift Operational Envelopes To Improve Selection/transition Decisions And Operational Visualization In The Permian
    S. Scott, Texas Tech University
  • Alternate 233001
    Case History For A Field Test Of A Novel Positive-Displacement-Pump Including A Performance Comparison To Existing Gas Lift Production
    R. Tompkins, R. Taylor, J.R. McGlothen, M. Eagleston, LateraLift LLC; C. Durocher, Gates Engineering & Services Division