Technical Session 27: Integrated Field Case Studies: Driving Optimisation Across Reservoir, Surface, and Operations
Thursday, 15 October
Room B1, Boulevard Level
Technical Session
-
1600-1620 234331Advanced Diagnostic and Inspection Solutions for Restoring Capacity in Non-Piggable GRE Pipelines
-
1620-1640 234588Reversing Severe Depletion in a Late-start Light-oil Waterflood Through Field-scale High-VRR Pressure Recovery
-
1640-1700 234360Innovative Biocide Chemistry Providing Long-lasting Microbial and Souring Control, Enabling Sustainable Frac Water Reuse While Reducing Chemical Demand and Environmental Footprint
-
1700-1720 234500Performance Evaluation of Cyclic Steam Injection in Barefoot Completed Well in a Heavy Oil Reservoir-a Case Study of Bikaner-nagaur Basin









