Skip to main content
Loading

Technical Session 25: Offshore Facility Management

Thursday, 15 October
Room B2, Boulevard Level
Technical Session
  • 1400-1420 234527
    Introducing The Upcoming Changes In Technical Requirements For Managing Integrity Of Fixed Offshore Structures In Iso 19901-9, 2Nd Edition
    P. Dev, Rosenxt UK Ltd
  • 1420-1440 234443
    Rov-based Electrical Remediation To Restore Umbilical Insulation Resistance And System Redundancy In Mature Subsea Gas Field
    J. Jung, POSCO International; P. Win Maw, POSCO International Corporation; Y. Myo, POSCO International; K. Kyaw, Posco International Corporation; J. KIM, POSCO International
  • 1440-1500 234423
    Engineering Solutions To Unlock Enhanced Throughput Capacity In An Existing 26-inch Sealine And Wellhead Platform Facilities For 240mmscfd Gas Production
    P. Keepthong, PTTEP; P. Teerachaimahite, PTT Exploration and Production Public Company Limited
  • Alternate 234483
    Decoupled Mechanisms In A Tubing Failure Case - Flow Coupling Material Noncompliance And External Corrosion
    A.H. Hamed, ADNOC; T.K. Ban Hidarah, N.H. Alyaarbi, ADNOC Onshore
  • Alternate 234498
    Engineering A Fire-resistant Remote Ignition (fr-ri) System For High-temperature Industrial Reboilers: A Material-based Solution To Operational Hazards
    I.A. Firdaus, M. Bahroinuddin, PHE ONWJ
  • Alternate 234409
    Operational Strategy To Improve Ngl Production And Reduce Flaring During High Condensate Season
    M.A. Rumaih, Saudi Aramco
  • Alternate 234501
    Innovative Non-intrusive Solution Tailored For Production Allocation On Brownfield Assets
    N. Latif, Brunei Shell Petroleum; S. Sridhar, Expro Americas LLC
  • Alternate 234596
    Mic Risk Assessment In Upstream Pipelines: An Optimized Corrosion Mitigation Approach 
    M. Al Seiari, M. Alhammadi, ADNOC Onshore
  • Alternate 234441
    Directional Data - Using Ultrasonic Beamforming To Unlock In‑Pipeline Inspection Data Downloads
    A. Watt, Woodside Energy