Technical Session 22: Case Studies in Field Development Planning
Thursday, 15 October
Room B2, Boulevard Level
Technical Session
-
1100-1120 234626From Discovery To First Oil In 14 Months: An Integrated, Phased Approach To Reducing Field Development Cycle Time
-
1120-1140 234458The Unknown Information Paradox: Absolute Vs. Relative Value Of Information In Appraisal Planning - A Case Study
-
1140-1200 234614Enabling Cost-efficient Deepwater Subsea Projects While Strengthening Malaysia’S Position As A Technology Hub In The Region
-
1200-1220 234592Flow Assurance Strategies For High Pour Point Crude Oil Field Development: A Comprehensive Study On Pipeline Design And Operational Optimization
-
Alternate 234335Reservoir Management Of World’S Largest In-situ Combustion Project In Mehsana
-
Alternate 234381Integrated Subsurface Studies Of Depleted Hydrocarbon Reservoirs For Field Storage Development Plan
-
Alternate 234467Lithium Recovery From Produced Water: Optimized Delithiation Of HTO Under Mild Acid Conditions

