Technical Session 20: Production Operations Optimisation
Thursday, 15 October
Room B2, Boulevard Level
Technical Session
-
0900-0920 234494Tangguh Lng Case Study: Zero Cost Operational Solution To Persistent Amine Foaming In Lng Pretreatment
-
0940-1000 234422Revisited Flow Assurance Strategy For High Water Cut Subsea Gas Well: Managing Cold Start-up Under Lp Mode Via Thermal Recovery And Water Breakthrough Timing Analysis
-
1000-1020 234424Talking To Pigs - Live Pig Telemetry And Subsea High‑Speed Data Access
-
Alternate 234413Integrated Marine Collision Risk Management At Bp Tangguh Lng Offshore Facilities
-
Alternate 234618Integrated Multi-contaminant Fluid Characterization To Address Flow Assurance And Production Chemistry Challenges In A Complex Offshore Gas Condensate Reservoir With High Water Production.
-
Alternate 234405Reinjecting The Produced Water To Boost Recovery And Slash Opex In Middle East's Waterfloods
-
Alternate 234411Acid Gas Removal Unit (Membrane Technology): Root Cause Analysis Of Underperformance And Transition To Best-in-class Operation