Technical Session 09: Well Completion and Intervention
Tuesday, 13 October
Room B3, Boulevard Level
Technical Session
Session Chairpersons
-
1620-1640 234576First Field Application In Kuwait of an Electric Sub Release Tool for E-line Coiled Tubing Perforation in HPHT Wells
-
1640-1700 234396CFD-Driven Optimisation of Through-Tubing Sand Screens: Insights from Simulation and Field Performance
-
1700-1720 234426Extending PCP Run Life in Coal Seam Gas Wells: A Mean-Time-to-Failure Framework and the Interventions That Moved It
-
Alternate 234395Challenges and Solutions for Sustained Casing Pressure Diagnostic and Remediation
-
Alternate 234480Innovative Strategies to Address Challenging Emulsion and Formation Damage Issues: A Case Study of Open Hole Standalone Screen (OHSAS) Completions
-
Alternate 234629Root Cause Analysis: Dealing with Dynamic Gas Field Development Plan Causes the Material Selection Failure on X-mass Tree in Sour-sweet Gas Environment and High Temperature Well
-
Alternate 234417Implementation and Performance of Valve-controlled Encoding in Fluidic Wave Communication
-
Alternate 234400Production Reactivation of a High-temperature Sub-hydrostatic Gas Well Using Coiled Tubing Intervention for Sliding Sleeve Shifting Leveraging Real-time Fiber-optic Temperature and Acoustic Diagnostics
-
Alternate 234333Well Intervention Re-imagined: How a Simple Yet Innovative Approach Eliminated Gas Flaring and Optimised Operations in a Sour Sub-hydrostatic Environment
-
Alternate 234545Maximising Reservoir Drainage Through Crossflow Free Dual Layer Production Using Velocity String Completion in Jambi Field Indonesia
-
Alternate 234342Converting Fiberglass-cased Observation Wells to Oil Producers: A Case Study in Novel Well Interventions
-
Alternate 234418Expanding the Intervention Envelope for Production Logging n Comiplex Extended Reach Wells