Technical Session 03: Cementing and Well Integrity
Tuesday, 13 October
Room B3, Boulevard Level
Technical Session
-
1115-1135 234459Ultrasonic Evaluation of Packer Performance and Formation Movement Behind Casing
-
1135-1155 234532Microfine Cement for Coiled‑Tubing Cement Packer and Zone Isolation: A Practical Alternative to Api Class G in Restricted and Loss‑Prone Completions
-
1155-1215 234528Record-Length 9-5/8” Tubular Patch Restores Casing Integrity to Zero Water Cut and Boosts Oil Production +440 BOPD: A High-Value Remediation Case from North Kuwait
-
1215-1235 234399Advancing Cement Sheath Evaluation in Subsea Wells In Australia: Novel Low-Frequency Dipole Sonic Technology for Enhanced Accuracy and Operational Efficiency
-
Alternate 234376Engineered Design and Optimisation to Cement Tapered Liners in Large Open Hole to Achieve Zonal Isolation and Shoe Integrity
-
Alternate 234529Multizone Isolation with Lightweight Cement Slurry in a Cased-and-Perforated Well in a Mature Offshore Field, Brunei
-
Alternate 234412Research on the Properties of Cement Sheath for Heavy Oil Thermal Recovery
-
Alternate 234364Winchless Diagnosis and Remediation of Tubing to Annulus Communication in an Offshore Gas Production Well








