Technical Session 26: Drilling in HPHT Environment
Thursday, 16 October
Meeting Room 2, Level 3
Technical Session
Session Chairpersons
-
1400-1420 226457Defining the Mud Weight Window While Drilling through Depleted and Overpressured Reservoirs in a HPHT Well
-
1420-1440 226279Overcoming Drilling Hazards and Pore Pressure Uncertainty, an Mpd Approach in the Kra Al Maru Field for the Deepest Well Since 2002.
-
1440-1500 226571Enhancing Drilling Efficiency in Limestone HPHT Sour Reservoir: Formate-Based Drill-In Fluid Application in Madura Offshore, Indonesia
-
1500-1520 226387Enabled Resuming Drilling, Run Liner and Cementation by First Distinguishing from Kick and then Overcoming Extreme Ballooning Conditions in a Controlled Environment, Navigating Through Ultra-narrow Window in Abnormal Pressure Wells by Implementing Managed Pressure Techniques
-
Alternate 226525A Novel and Economical Combination of (Micromax /Ilmenite) for High Pressure and High Temperature Oil-Well Cement Applications
-
Alternate 226297Advancing Invert Emulsion Drilling Fluid Performance in High-Pressure and High-Temperature Conditions with a Novel Organoclay Additive
-
Alternate 226467Formation Damage Prevention in HPHT Wells: Evaluation of Cellulose Fibre and Granular LCM Using Ceramic Disc Testing