Technical Session 25: Offshore Facilities and Operations
Thursday, 16 October
Meeting Room 1, Level 3
Technical Session
-
1400-1420 226338Data Driven Journey to Optimise Offshore Sand Management
-
1420-1440 226356Organic Learning Curve Drastically Increases Efficiency of Novel Platform Installation with a Jack-Up Rig in Brunei
-
1440-1500 226398Innovative Digitalisation of Intermittent Wells Open-close Operations: Enhancing Gas Production in Tunu North Marginal Field
-
1500-1520 226474Microbiologically Influenced Corrosion (MIC) Monitoring And Mitigation Through Onsite Sessile Bacteria Sampling And Analysis In A Seawater Treatment System
-
Alternate 226454Nautilus The World's First Subsea Pipeline Inspection and Repair Robot
-
Alternate 226275Innovative Subsea Visual Positioning Technology for Offshore Structure Installation
-
Alternate 226575Resolving Unprecedented Jack-Up Rig Leg Extraction Failures: A Case Study of Jetting System Inefficacy in Mahakam Field
-
Alternate 226435Enhancing Offshore Turbine Control Panel Reliability with Air Cooling System Design: Proactive Solution to Thermal Management
-
Alternate 226360Fleet Optimisation in Oil and Gas Logistic Operation at Mahakam Delta: Success Story of Integrated Shipment Consolidation and Action Research Framework Implementation
-
Alternate 226518Simplified Flow Assurance Review for Offshore Pipelines in Operation Stage
-
Alternate 226566Accelerate Field Production Ramp Up Post Shutdown Despite Gas Constraint with Tailor-made Platform/well Start Up Sequence and Running the Optimum Gaslift Compressors Combination