Skip to main content
Loading

Technical Session 18: Wellbore Stability and Well Control

Wednesday, 15 October
Meeting Room 3, 3rd Floor
Technical Session
  • 1600-1620 226576
    Mastering Exploration In Thailand: Real-time Geomechanics With Managed Pressure Drilling (mpd) & Logging While Drilling (lwd) In Challenging Shaly Sand Reservoirs
    H. Dalgit Singh, N. Phettongkam, Weatherford International Inc.; K. Homcha-Em, R. Kudisri, PTT E&P PLC
  • 1620-1640 226483
    Ultra-high Pressure Well Control Technology And Supporting Equipment For Ultra-deep Carbonate Rock In Tarim Oilfield
    C. Wang, J. Lu, Z. Wang, G. Zou, T. Xia, J. Chen, Petrochina Tarim Oilfield Company
  • 1640-1700 226449
    Successful Wellbore Strengthening Case Studies Through Holistic Geomechanics Understanding In Severely Depleted Reservoirs
    L. Devadass, PETRONAS; M. Thuzar, M. Abdul Razak, PETRONAS Carigali; T. Chee Phuat, Petronas Carigali Sdn Bhd; I. Idris, PETRONAS Carigali
  • 1700-1720 226510
    Revolutionary Automated Heavy-duty Well Capping Robotrobot: A Breakthrough Solution For Extreme Tertiary Well Control Incidents
    Y. X, J. Zhu, Vertechs Group
  • Alternate 226295
    A Review Of Successful Applications Of Subsurface Barrier Valves In Subsea Deepwater Gas Projects In China
    G. Zhao, L. Zhang, H. Zhao, Schlumberger
  • Alternate 226351
    Risk Mitigation Strategy Improves Drilling Performance Through Geomechanical Analysis In Deepwater Directional Wells: A Case Study From The South China Sea
    S. Wang, Baker Hughes
  • Alternate 226495
    The First Successful Application Of Intelligent Management Pressure Drilling Solved Serious Drilling Complex Problems In The Qiulitage Block Of The Tarim Basin, China
    Z. Wang, S. Feng, Z. Quan, C. Kaifeng, Z. Li, Petrochina Tarim Oilfield Company
  • Alternate 226430
    An Analytical Approach To Risk Reduction And Drilling Performance Improvement Using 3d Geomechanical Modelling
    Z. Wei, Research Institute of Petroleum Exploration and Development
  • Alternate 226333
    First Comingled Well In South Kuwait Employing Managed Pressure Drilling Technics To Mitigate Drilling Hazards While Drilling, Running And Cementing 5 Inch Production Liner Based On Real Time Data.
    B. Selami, Weatherford; S. Sindhu, Y. Al-Shammari, KOC; R.M. Alqabandi, Weatherford Kuwait For Petroleum Services Co; J. Bashir, Kuwait Oil Company; H. Benyounces, Weatherford