Technical Session 12: Drilling and Completion Fluids
Wednesday, 15 October
Meeting Room 3, Level 3
Technical Session
Session Chairpersons
-
1100-1120 226527Successful Wellbore Fluid Unloading Using Locally Manufactured Swab Cups for Underbalance Perforation: Swabbing Operation Case Study from the Nubi-mahakam Field, Indonesia
-
1120-1140 226461Successful Application of Integrated Lost Circulation Control Treatments Using an Innovative Fibrous Pill and Advanced Thixotropic Cement Solutions in Well Control Situations While Drilling and Prior to Cementing in Malaysia
-
1140-1200 226273First Experience Drilling Overpressured Shale and Depleted Limestone in a Single Hole Section in Kuwait Using Highly Engineered Drilling Fluid - A Case History
-
1200-1220 226280Brine-Based Riserless Fluid: Enabling the World’s Most Deviated 24-Inch Section with Cost Optimisation and Waste Minimisation in Deepwater Malaysia