Technical Session 03: Extended Reach and Horizontal Drilling and Completions
Tuesday, 14 October
Meeting Room 3, 3rd Floor
Technical Session
-
1400-1420 226550Longest Slim Hole Erd Wells Campaign With Limited Entry Liner Using Waterbased Mud In Onshore Abu Dhabi
-
1420-1440 226528Integration Of Reservoir Engineering And Geomechanics Study To Ensure Horizontal Well Drilling Success In The Complex Waterflooding Development Fault-block- A Case Study
-
1440-1500 226294Synergy Of Reservoir Mapping Service And Drilling Intelligence Service To Successfully Push The Longest ERD Well To The Limit In A Faulted Reservoir Of Offshore China Marginal Oilfield
-
1500-1520 226419Transforming Delta Mahakam: Innovative Well Architecture Optimization Delivers Significant Cost Savings Of $1.8 Million On The Longest Well
-
Alternate 226491Successfully Drilling Big Hole Section Erd Well In Highly Deviated Section, Long Footage, Total Losses And Wellbore Stability Issue In Offshore North Madura, Indonesia.
-
Alternate 226480Exertion Of 4 Key Elements In Horizontal Drilling, Fostering Cycle Time And Cost Efficiency Of Horizontal Well In P-Field, Rokan Area, Sumatera.
-
Alternate 226276Pioneering Techniques for Drilling Extended Reach Wells in Complex Reservoirs
-
Alternate 226290A Systematic Approach To Mitigate Drilling Hazards And Improve Horizontal Well Drilling Efficiency In A Conglomerate Reservoir
-
Alternate 226487Pushing Boundaries Setting A Record For Longest Horizontal Well Drilled In Uae
-
Alternate 226329Understanding Running Behavior To Improve Slim Well Lower Completion In Erd Well Injector