Skip to main content
Loading

Technical Session 03: Extended Reach and Horizontal Drilling and Completions

Tuesday, 14 October
Meeting Room 3, Level 3
Technical Session
Session Chairpersons
Dian Permanasari - SLB
Fikri Irawan - Weatherford
  • 1400-1420 226528
    Integration of Reservoir Engineering and Geomechanics to Ensure Horizontal Well Drilling Success in a Complex Waterflooding Development Fault Block - A Case Study
    Y. Zhou, Baker Hughes; Y. Zhang, Z. Cheng, H. Guo, CNOOC China Ltd, Shenzhen; H. Yu, S. Wang, Baker Hughes
  • 1420-1440 226294
    Integrated Measurement-While-Drilling and Reservoir Mapping Technologies Enabled Effective and Economical Offshore Marginal Oilfield Development and Broke the ERD Well Records in North China Offshore
    Y. Li, CNOOC EnerTech-Drilling& Production Co.; D. Wu, CNOOC-Tianjin; C. Wang, B. Chang, F. Wang, B. Xu, S. Li, C. Wang, L. Zhang, K. Wu, C. Chen, Y. Wang, L. Wang, SLB
  • 1440-1500 226491
    Successfully Drilling Big Hole Section ERD Well in Highly Deviated Section, Long Footage, Total Losses and Wellbore Stability Issue in Offshore North Madura, Indonesia
    T. Setiawan, G.A. Samudera, PETRONAS
  • 1500-1520 226480
    Exertion of 4 Key Elements in Horizontal Drilling, Fostering Cycle Time and Cost Efficiency of Horizontal Well in P-Field, Rokan Area, Sumatera.
    M. Taufiqurrahman, A. Reinhard Panjaitan, S. Boris, A.B. Pratama, B.F. Satria Hutama, N.B. Antono, S. Krishardjono, D. Mulya, Pertamina Drilling Services Indonesia; A.A. Aulia, H. Setyawan, Pertamina Hulu Rokan