Technical Session 03: Extended Reach and Horizontal Drilling and Completions
Tuesday, 14 October
Meeting Room 3, Level 3
Technical Session
-
1400-1420 226550Drilling and Completion of the World's Longest Slim Hole Erd' with Limited Entry Liner Completions Using Water-based Mud Saves CAPEX in Onshore Abu Dhabi
-
1420-1440 226528Integration of Reservoir Engineering and Geomechanics to Ensure Horizontal Well Drilling Success in a Complex Waterflooding Development Fault Block - A Case Study
-
1440-1500 226294Integrated Measurement-While-Drilling and Reservoir Mapping Technologies Enabled Effective and Economical Offshore Marginal Oilfield Development and Broke the ERD Well Records in North China Offshore
-
Alternate 226491Successfully Drilling Big Hole Section ERD Well in Highly Deviated Section, Long Footage, Total Losses and Wellbore Stability Issue in Offshore North Madura, Indonesia
-
Alternate 226480Exertion of 4 Key Elements in Horizontal Drilling, Fostering Cycle Time and Cost Efficiency of Horizontal Well in P-Field, Rokan Area, Sumatera.
-
Alternate 226290A Systematic Approach to Mitigate Drilling Hazards and Improve Horizontal Well Drilling Efficiency in a Conglomerate Reservoir
-
Alternate 226487Pushing Boundaries Setting A Record For Longest Horizontal Well Drilled In Uae