Skip to main content

 

 

Loading

Knowledge Sharing ePoster Session 5

Wednesday, 15 October
Ballroom 1 & 2, Level 3
Poster
  • Alternate 226345
    Research and Application of Closed-loop Electronic Control Variable Diameter Stabiliser in Directional Drilling
    D. Dang, CNPC; Z. Huang, UPC; Z. Lina, H. Zhang, J. Hu, CNPC
  • Alternate 226499
    Dual Salt Polyamine Water-based Mud First Application Fostering Indonesia's National Oil and Gas Company Newcomer Offshore Rig in Indonesia
    T.A. Argo Bimantoro N, PT. Pertamina EP; M. Iqbal, PT PHE OSES; M. Taufik, B. Punto Adi, N.P. Bungsu, PT. Pertamina EP
  • Alternate 226416
    Investigation into the Mechanism of Microbial Thermal Enhanced Oil Recovery
    Z. Wang, H. Liu, China University of Petroleum; G. Sun, Sinopec Shengli Oilfield; C. Luo, Y. Pan, China University of Petroleum; J. Hu, Sinopec Shengli Oilfield
  • Alternate 226540
    Step Changed Towards Initial Wellbore Clean Up for New Wells, with Cost Competitiveness.
    S.N. Al Saqri, Q.Y. Al-Rawahi, Petroleum Development Oman; A.S. Al Salti, A.A. Al Rahbi, H.M. Al Naamani, K.A. Al Riyami, Petroleum Development Oman LLC; N.A. Al Kitani, Biyaq Oilfield servicess LLC; D. Ghosh, Epygen Labs FZ LLC; B. Ghosh, Khalifa University
  • Alternate 226534
    “Dry Water” Pickering Emulsions: Encapsulation and Triggered Release of Chemicals for Polymer Schmoo Degradation
    H. Singh, M. Farooq, Indian Institute of Technology Kanpur; A. Kumar, Cairn Oil & Gas, Vedanta Limited; H. Sharma, Indian Institute of Technology Kanpur
  • Alternate 226438
    Single-trip Multizone in Challenging Highly Deviated Wells - Case Study from Natuna Sea
    F. Marpaung, D. Luwansha, A. Ardian, Y. Anggoro, C. Sutyanto, Medco E&P Indonesia
  • Alternate 226495
    The First Successful Application of Intelligent Management Pressure Drilling Solved Serious Drilling Complex Problems in the Qiulitage Block of the Tarim Basin, China
    W. Zhe, F. Shaobo, Z. Quan, C. Kaifeng, L. Zhuo, Petrochina Tarim Oilfield Company
  • Alternate 226529
    Effectiveness of AICD Completion for Long Term Water Shutoff: Workflow for Selection & Success of Autonomous Completion Type to Meet EOR Challenges in Multilayer Well in Chad
    J. Khan, Y. Chen, CONOVA