Technical Session 13: Well Plug & Abandonment
Wednesday, 30 September
Room 2, Hall 6, Level 1
Technical Session
-
1530-1550 234313Beat The Tilt - Innovative Slanted Wellhead Abandonment At Alpha-M Platform
-
1550-1610 234244Rigless Coiled Tubing Cement Plug Placement, Enhancing Efficiency And Well Integrity For Mature Field Abandonment In Abu Dhabi.
-
1610-1630 234309Enabling Hybrid Well Abandonment Operations On Space-constrained Offshore Platforms During Monsoon Conditions Using A Lightweight Hydraulic Workover Unit
-
1630-1650 234269First Field Trial Of A Next-Generation Fully Controllable Alloy Wellbore Sealing Technology
-
Alternate 234263Extended Length Cup Type Perforate, Wash And Cement Annular Restoration For Well Recovery: A Three Well Onshore Campaign With A 400ft Single Stage Interval
-
Alternate 234260Application Of High‑Performance Epoxy Resin Through Casing‑Casing Annulus Valves For Rigless Mitigation Of Sustained Casing Pressure: An Offshore Case Study
-
Alternate 234274An Enhanced Approach By Utilizing The p&A Tool Or Trt (tubing Release Tool) In Plug And Abandonment Wells, Achieving Significant Reductions In Well Cost And Duration By A Major Operator In The Uae
-
Alternate 234283Legacy Well p&A Considerations And Challenges For Ccs Projects
-
Alternate 234298Rig-less Exothermic Reaction Technology With Real-time Readout - Fit For Purpose Today And Into The Future
-
Alternate 234312Field Validation Of Intervention-less Acoustic Top Of Cement Verification During Well Abandonment Operations
-
Alternate 234278Accelerating Mature Well Decommissioning Through Data-driven Rig-less Plug And AbandonmentStrategies In Mature Fields Of Southern Pakistan: A Fit-for-purpose Approach