Technical Session 13: Well Plug & Abandonment
Wednesday, 30 September
Room 2, Hall 6, Level 1
Technical Session
-
1530-1550 234244Rigless Coiled Tubing Cement Plug Placement, Enhancing Efficiency And Well Integrity For Mature Field Abandonment In Abu Dhabi.
-
1550-1610 234309Enabling Hybrid Well Abandonment Operations on Space-Constrained Offshore Platforms During Monsoon Conditions Using a Lightweight Hydraulic Workover Unit
-
1610-1630 234269First Field Trial Of A Next-Generation Fully Controllable Alloy Wellbore Sealing Technology
-
Alternate 234274An Enhanced Approach By Utilizing The p&A Tool Or Trt (tubing Release Tool) In Plug And Abandonment Wells, Achieving Significant Reductions In Well Cost And Duration By A Major Operator In The Uae
-
Alternate 234283Legacy Well P&A Considerations And Challenges For CCS Projects
-
Alternate 234312Field Validation Of Intervention-less Acoustic Top Of Cement Verification During Well Abandonment Operations
-
Alternate 234278AcceleratingMature Well Decommissioning through Data-Driven Rig-less P&A Strategies inMature Fields of Southern Pakistan: A Fit-for-Purpose Approach
