Skip to main content

SPE Logo   ICOTA logo

SPE/ICoTA Asia Pacific Well Intervention and P&A Conference and Exhibition
29–30 September 2026 | Kuala Lumpur, Malaysia

Loading

Technical Session 12: Workovers & CTD

Wednesday, 30 September
Room 1, Hall 6, Level 1
Technical Session
  • 1530-1550 234228
    Field-proven Ultrasonic Pulse‑Echo Logging For Late-life Malay Basin Interventions: Cut-and-pull And Sidetrack Decisions
    E. Lim, Y. Kim, Baker Hughes; S.N. Ishak, PETRONAS; P.N. Nguyen, Baker Hughes
  • 1550-1610 234276
    Unified Pdc Bit And Bha Design For High‑Dls Steerability And Multi‑Lithology Performance In Slimhole Coiled‑Tubing Drilling
    H.F. Alsaif, S. Siddik, Baker Hughes Co. Saudi Arabia
  • 1610-1630 234295
    A Novel Siphon-string Deployment Strategy To Boost Oil Recovery In Mono-trip Gas-lift Completions: Successful Case Studies From The Handil-mahakam Field, Indonesia
    L.P. Kusuma, R.G. Perdana, R.C. Rachmady, M.A. Hafidz, K. Norja, M. Risal, N. Smaz, PT Pertamina Hulu Mahakam
  • 1630-1650 234290
    Breakthrough Approach On Annulus Clean Up To Unlock Oil Recovery In Gas Well Completions: A Successful Operational Case Study From The Handil-mahakam Field, Indonesia
    L.P. Kusuma, R.G. Perdana, M.A. Hafidz, R.C. Rachmady, M. Risal, N. Smaz, PT Pertamina Hulu Mahakam
  • Alternate 234241
    Iterative Digital Dull Grading For Ctd Bit Optimization: A Data‑Driven Approach To Improve Performance In Mature Fields
    H.F. Alsaif, M. Alghanim, S. Siddik, Baker Hughes Co. Saudi Arabia
  • Alternate 234236
    Reducing Drillout Npt Through Early Detection And Controlled Response To Tubing-part Events
    T. Thomas, NOV Inc.; K. Scherer, NOV
  • Alternate 234253
    From Producer To Injector: Integrated Workover Design For Waterflood Initiation In A Mature Field
    P. Kurniawati, PT Pertamina Hulu Mahakam; W. Krisnanto, A. Nugroho, Pertamina Hulu Energi; D. Laksono, PT Pertamina Hulu Energi; B. Handoko, Pertamina Hulu Energi

Countdown