Skip to main content
Loading

Technical Session 10: Coiled Tubing II

Wednesday, 30 September
Main Stage, Hall 6, Level 1
Technical Session
Session Chairpersons
Mohamed Heikal Kasim - Hibiscus Malaysia Limited
Azwan Keong - SLB
  • 1330-1350 234262
    Integrated Well Intervention Strategies for Inverted Gas Lift System (IGLS) Retrieval and Pre-P&A Preparation: A Case Study in Planning and Execution Using Wireline, Rig, And Coiled Tubing from the North Sea
    M. Afsari, A. Pando, B.C. Anene, S. Grundnes-Tjøtta, SLB; M. King, H. Kettle, N. Duarte, Equinor
  • 1350-1410 234291
    An Engineering Approach to Successful Cement Milling in A 3,777 M Long Interval Using Coiled Tubing in The Mahakam Field
    M.R. Ramadhan, A. Isawiseman, P. Yudis, PT Halliburton Indonesia; R. Rachman, A. Suhartanto, E. Suprapto, PT Pertamina Hulu Mahakam
  • 1410-1430 234221
    Extending Asset Lifecycle: Advanced Chemical Remediation Strategies As An Alternative To Rig-based Casing Workovers
    M.R. Amirov, A. Palomo, M. Omer, S. Arafat, M. Jaskiewicz, Weatherford International
  • 1430-1450 234287
    Realising Newly Completed Oil Producer Well Potential Via Complex Catenary Coiled Tubing Milling Operations with Eccentric Mill Bit
    L.T. Wong, T.C. Liew, A.Z. Alimuddin, M.H. Kasim, M.F. Abdul Ghaffar, Hibiscus Malaysia; H. Hassan, M.N. Mohd Kadir, Setegap Ventures Petroleum Sdn Bhd

Countdown