Technical Session 08: Well Logging
Wednesday, 30 September
Technical Theatre, Hall 6, Level 1
Technical Session
-
0900-0920 234246Objective-driven Data Acquisition for Diagnosing Sustained Annulus Pressure in a High Temperature Gas Well: A Fit-for-purpose Integrity and Isolation Strategy
-
0920-0940 234265Enabling Flow Profiling in Horizontal Inflow Control Device Completion Using Innovative Realtime Combination of Compact Array Production Logging, Sigma, And Water Flow Measurements By E-line Coiled Tubing
-
0940-1000 234307Diagnosing and Preventing Float-Collar/Shoe-Track Integrity Failures Using Multi-Barrier PEC Corrosion Logging and Completion Forensics: Case Studies from Onshore Middle East Wells
-
Alternate 234315Real-Time Coiled Tubing Logging for Cement Integrity and Zonal Contribution Evaluation in a Highly Deviated Dual-String Well
