Skip to main content

SPE Logo   ICOTA logo

SPE/ICoTA Asia Pacific Well Intervention and P&A Conference and Exhibition
29–30 September 2026 | Kuala Lumpur, Malaysia

Loading

Technical Session 07: Slickline

Wednesday, 30 September
Room 1, Hall 6, Level 1
Technical Session
  • 0900-0920 234238
    First Deployment Of Real Time Slickline (rts) - Digitalizing Conventional Intervention
    D. Gemmel, SLB; O. ALTAF, Schlumberger Limited; J. Segura, SLB
  • 0920-0940 234256
    Apparatus And Control Of Remotely Operated On-demand Barrier To Mitigate Well Intervention Risks
    A. Mohamad Khalil, M. Mohd Effendi, M. Zainal Abidin, S. Ross, Interwell
  • 0940-1000 234225
    Mitigating Wireline Galling in High Gas-Oil Ratio and Gas Well Operations
    H. Wong, M.I. Abd Jalil, A. Azman, M. Ishak, Petronas Carigali Sdn Bhd
  • 1000-1020 234301
    Unraveling Offshore Mini Platform Limitation Thru Slimline Unit Operation: A Conventional Slickline Footprint Packed With Eline Versatile Capabilities
    N. Fitriani, A. Ariwibowo, E. Dharma, H. Maulana, D. Kurniawan, Medco E&P Indonesia; E. Siregar, S. Sutanto, Baker Hughes
  • Alternate 234266
    Innovative Debris Removal Launcher Tool To Reinstate Downhole Safety Valve Integrity
    A. Charlie, T. Setiawan, PETRONAS Carigali Malaysia; L. Dasan, Petronas Carigali Sdn Bhd; N. Foo Kwang Hui, PETRONAS Carigali Malaysia Sdn Bhd
  • Alternate 234247
    Enabling Downhole Access Through Failed TRSV Using Retrievable Sleeve
    M. Haslan, PETRONAS Carigali Malaysia Sdn Bhd; T. Setiawan, PETRONAS Carigali Malaysia; N. Foo Kwang Hui, PETRONAS Carigali Malaysia Sdn Bhd
  • Alternate 234304
    Evaluation Of Micro-leakage And Behind-casing Flow Using Distributed Fiber Optic Sensing In A Multistring Well
    D.S. Reka, EXPRO; R. Mudayana, Expro (B) Sdn Bhd

Countdown