Skip to main content
Loading

Technical Session 06: Subsea Interventions

Tuesday, 29 September
Technical Theatre, Hall 6, Level 1
Technical Session
Session Chairpersons
Cheeyong Ang - PETRONAS Carigali Sdn. Bhd.
Guan Han Khor - PETRONAS Carigali Sdn. Bhd.
  • 1600-1620 234250
    Risk-based Engineering Evaluation and Field Deployment of a Linear Override Locking Assembly for Subsea PMV Actuator Leakage Mitigation
    J. Jung, P.P. Maw, Y.H. Myo, K.K. Kyaw, J. Kim, POSCO International Corporation
  • 1620-1640 234271
    Case Study: Open Water Hydraulic Intervention System Performance on a Multi-client Hydraulic Intervention Campaign for Production Recovery in Offshore Malaysia
    P.A. Rice, D. Morriss, SLB OneSubsea; L.C. Chung, SLB
  • 1640-1700 234299
    Extending Well Life Without a Rig: Targeted Water Shut-Off in a Deviated Subsea Gravel Pack Completion
    K. Oddie, Interwell Ltd; T. Ringe, B. Kvåle, Interwell AS; M. Midthassel, K. Reiestad, Vår Energi Norge AS
  • 1700-1720 234319
    Contingency Planning for Formation Isolation Valve Opening - A Lesson Learned from Australia Deepwater
    E. Kong, Santos Ltd.; M. Billaud, SLB; D. Waly, Santos Ltd.; J. Sedmak, SLB

Countdown