Technical Session 06: Subsea Interventions
Tuesday, 29 September
Technical Theatre, Hall 6, Level 1
Technical Session
Session Chairpersons
-
1600-1620 234250Risk-based Engineering Evaluation and Field Deployment of a Linear Override Locking Assembly for Subsea PMV Actuator Leakage Mitigation
-
1620-1640 234271Case Study: Open Water Hydraulic Intervention System Performance on a Multi-client Hydraulic Intervention Campaign for Production Recovery in Offshore Malaysia
-
1640-1700 234299Extending Well Life Without a Rig: Targeted Water Shut-Off in a Deviated Subsea Gravel Pack Completion
-
1700-1720 234319Contingency Planning for Formation Isolation Valve Opening - A Lesson Learned from Australia Deepwater
