Technical Session 04: Production Enhancement I
Tuesday, 29 September
Room 2, Hall 6, Level 1
Technical Session
-
1400-1420 234215Cost-effective Water Shutoff Using Thermosetting Resin Deployed With Dump Bailers: First Field Application
-
1420-1440 234222Monetizing A Well With Casing Hanger Leak: Risk‑Based Concept Selection Of Ctu Gas Lift Versus Conventional Gas Lift
-
1440-1500 234223Cemented Monobore Completion With Boron Erosion-resistant Sand Screens: First Field Deployment In The Gulf Of Thailand
-
1500-1520 234272The Application Of Channel Fracturing To Revitalize Water Injection In The Burgan Upper Sand: Restoring Injectivity In High-leakoff Sandstones
-
Alternate 234232Field Evaluation Of Relative Permeability Modifier Effectiveness Through Integrated DTS And Production Logging Measurements
-
Alternate 234267Rigless Wellhead Intervention For Constrained Offshore Assets
-
Alternate 234235First Application Of Braided Line Deployment For Gas Lift Deepening Below A Production Packer In Malaysia: Operational Experience And Limitations Relative To Coiled Tubing
-
Alternate 234275Surfactant Selection For Oil And Gas Applications: A Comparative Performance Analysis Of Nano And Low-cost Surfactants
-
Alternate 234284Rewriting The Intervention Playbook For Complex Barefoot Level-1 Multilaterals: An Industry-first Real-time Hybrid Fiber-optic Coiled Tubing Diagnosis And Openhole Straddle Water Shutoff In A Three-leg Mauddud Carbonate Producer To Restore Production And Extend Well Life In North Kuwait
-
Alternate 234302Remedial Well Intervention Results In Five-fold Production Increase In Deep High Rock-strength Gas Well

