Technical Session 03: E-Line
Tuesday, 29 September
Main Stage, Hall 6, Level 1
Technical Session
-
1400-1420 234321Innovative Space Out System Combined with Advanced Electro-Hydraulic Tractor Enables Precision Mechanical Cutting Capability in Highly Deviated Wellbore
-
1420-1440 234320First Production Profiling of a Long Horizontal Well Using DFOS (DTS/DAS, LF DAS) and Multi Sensors PLT
-
1440-1500 234326Advanced Well Intervention Techniques in Deploying Extreme Expansion Bridge Plugs, A First in Southeast Asia - A Case Study
-
1500-1520 234322Multiline Deployed Thru Tubing Gravel Pack in a Unique Tubing Design to Address Sand Production Issues in a Mature Gas Field
