Production Optimization II
Thursday, 11 June
Louvre II
Technical Session
-
1400-1425 231693Rapid, Onsite Bacteria Population Assessment And Biocide Treatment For Mitigating Microbial-induced Corrosion: A Case Study Of The Microbial Treatment For Karoon’S Fpso Cidade De Itajaí
-
1425-1450 231699Successful and Unconventional Coiled Tubing Intervention for The Complex Re-Abandonment of a Slant Gas Well in Brazil
-
1450-1515 231698A Hybrid Predictive Control Approach With Echo State Networks For Real-time Optimization Of Electrical Submersible Pump Systems
-
1515-1540 231734Implementation Of High-efficiency Liftprime Pumps In Ecopetrol’S Cpo-09 Field, Case Study On Production Improvement, Mechanical Load Reduction, Energy Efficiency, And Performance Under Heavy Crude And High TDH Conditions
-
Alternate 231711Intelligent Well Optimization In Amazon Fields Using Jet Pump Mplt And Fluid Carrier Without Workover
-
Alternate 231676Leveraging Plugging And Abandonment In Onshore Brazil Using A Coiled Tubing Perf, Wash, And Cement Solution


