Production Optimization II
Thursday, 11 June
Louvre II
Technical Session
-
1400-1425 231693Rapid, Onsite Bacteria population assessment and Biocide Treatment for Mitigating Microbial-Induced Corrosion: A Case Study of the Microbial Treatment on an FPSO
-
1425-1450 231699Successful and Unconventional Coiled Tubing Intervention for the Complex Re-Abandonment of a Slant Gas Well in Brazil
-
1450-1515 231698A Hybrid Predictive Control Approach With Echo State Networks For Real-Time Optimization of Electrical Submersible Pump Systems
-
1515-1540 231734Implementation of High‑Efficiency ESP Pumps in CPO‑09 Field: A Case Study on Production Improvement, Mechanical Load Reduction, Energy Efficiency, and Performance Under Heavy Crude and High TDH Conditions


