Innovative Production Optimization Approaches: Applying Emerging Technologies to Complex Well Challenges
Wednesday, 10 June
Louvre I
Technical Session
This technical session will address advanced, fit for purpose production optimization challenges through structured enhancement methodologies aimed at maximizing asset value and improving well performance. The session will present proven, new and emerging technologies, integrated workflows, and engineering best practices designed to enable operators to systematically identify and resolve well specific production constraints. Emphasis will be placed on improving recovery efficiency, optimizing production system performance, and proactively mitigating operational, flow assurance, and asset risks across the full asset lifecycle.
-
1055-1120 231714Pillar Propped Hydraulic Fracturing Optimized by the Application of Monolayer Technique in the Llanos Orientales Basin From Colombia
-
1120-1145 231625The Synergistic Effect of Oil and Imidazoline-Based Inhibitors on the Corrosion of Carbon Steel in CO2-Rich Production Environments
-
1145-1210 231724ESP Stable Restarts Using PID Control and Programmable Acceleration Ramps
-
1210-1235 231738Subsea Water Oil Separation Systems: New Technology Perspectives, Consolidated Projects, and Lessons Learned


